Category: Design Progress

25% Public Information Meeting Recap and Opportunity to Comment

25% Public Information Meeting Recap and Opportunity to Comment

On Thursday evening, November 4th, 2021 the Community Path Project Committee (CPPC) held a virtual meeting to provide a project update and present the 25% design of the Belmont Community Path to the public. This meeting also provided an opportunity for community members to offer comments and ask questions about the 25% design. If you were unable to attend the meeting, a copy of the presentation is available for download, along with the 25% design plans, and a forum to share your feedback. The Nitsch team will use the received feedback to prepare the 75% design plans.

25% Submission – Public Information Meeting

25% Submission – Public Information Meeting

On Thursday, November 4th, 2021 at 7:00PM the Community Path Project Committee (CPPC) will be hosting a virtual meeting where the Nitsch Team will present the 25% Submission Plans that were submitted to MassDOT earlier this week. During the meeting attendees will be provided an opportunity to provide comments and ask questions about the preliminary design of the Belmont Community Path. A link for you to download a copy of the 25% design plans is provided below. Following the meeting, we will provide a copy of the presentation from the public meeting and a link to provide additional comments and ask questions on this website. We look forward to seeing you at the public meeting on the 4th.

Project Update (10/1/2021)

Project Update (10/1/2021)

The boring program, necessary for the design of proposed retaining walls and the underpass at Alexander Avenue, has been completed. The next step in the design process is to finish the Geotechnical Report, which will be used to complete the preliminary design. The 25% Design Submission plans and documents are scheduled to be submitted to MassDOT on October 29, 2021.


The Belmont Community Path Project Committee is planning to hold a Public Information Meeting on November 4, 2021 to present the 25% Design Plans. Specific meeting information will be posted as it becomes available.

Project Update (5/6/2021)

Project Update (5/6/2021)

You may have seen our survey crew along the railroad tracks during the last month. We have been obtaining additional survey information including trees and railroad utility locations necessary to advance the preliminary design.

The Design Team met with the MBTA last month to discuss the proposed Community Path design and our proposed construction methods for the Alexander Avenue Underpass. We are adjusting the preliminary design plans to incorporate the comments we received from the MBTA.  We also recently met with several abutters on Brighton Street and Pleasant Street, and we are modifying the design based on the feedback we received at these meetings.

Our geotechnical engineers continue to coordinate the logistics of the proposed boring program with Keolis and the MBTA.  The borings have been scheduled to begin during the first week of June.  Specific boring locations still need to be reviewed by Keolis and actual dates for accessing the MBTA Right-of-way are dependent on Keolis flagger availability. Borings are required to complete the Alexander Avenue Underpass design and the design of new retaining walls along the proposed Community Path.

Project Update (2/16/2021)

Project Update (2/16/2021)

We have been working with the Town and the Community Path Project Committee (CPPC) to refine the preliminary path design to incorporate comments received from abutters, the Town, and the CPPC.  

You my have seen our survey crews along the railroad during the last few weeks. They have been gathering additional survey information that is needed to progress the design, such as tree sizes and additional information behind 7 Channing Road.

Our geotechnical engineers received the executed entry license agreement from the MBTA on Wednesday 2/10. They are now working with Keolis to schedule flaggers so they can access the railroad property to conduct the borings required to complete the Alexander Avenue underpass design and the design for new retaining walls along the proposed path alignment.

CPPC Public Meeting Recap: July 16, 2020

CPPC Public Meeting Recap: July 16, 2020

On Thursday evening, July 16th, 2020 the Community Path Project Committee (CPPC) held a virtual meeting to provide a project update and present the 25% design progress to the public. This meeting was also an opportunity for community members to react to the progress plans. If you were unable to attend the meeting, a copy of the presentation is available for download, along with the design plans, and a forum to share your feedback until July 31st. The Nitsch team will then use the received feedback to fine-tune the 25 % design plans before submitting them to MassDOT in Fall 2020.

Community Path Project Committee Meeting Details: July 16, 2020

Community Path Project Committee Meeting Details: July 16, 2020

Please join us for a remote meeting to present the progress on the Belmont Community Path Project.

Thursday, July 16, 2020 at 7:00pm

This is in accordance with Governor Baker’s Executive Order of March 12, 2020; “Order Suspending Certain Provisions of the Open Meeting Law” – All Participation by Committee and Town Residents will be by Remote Access. If the audio becomes unavailable, the meeting will be paused until it can be restored, or the meeting will end.


MEETING AGENDA

Public Information Meeting for Phase 1 of the Belmont Community Path Project Draft 25% Design Documents

7:00PM: Meeting called to order

7:05 PM: Introduction by the CPPC

7:15PM: Presentation on 25% design by Nitsch Engineering

8:15PM: Public comments on 25% design

9:30PM: Meeting adjourned


HOW TO ACCESS THE MEETING

FOR PARTICIPANTS: The Community Path Project Committee meeting will start at 7:00 P.M. and you may join the meeting remotely starting at 6:50 P.M.  The meeting will also be broadcast and recorded by the Belmont Media Center.

LINK TO VIRTUAL MEETING:

TO PROVIDE YOUR FEEDBACK:

Enter your Full Name under participant if you would like to provide comments and feedback (only those with a name entered will be allowed to comment and provide feedback to the CPPC team)

When prompted by the meeting chair, you can “raise your hand” to be recognized by the meeting host

Comments will be limited by the Chair, shall be concise, and shall not repeat previous comments or questions presented by others before you Chair is not obligated to recognize all comments and may end comment period prior to your comment being heard


BY PHONE:

  • Dial-in: 1-929-205-6099
  • If you would like to provide comments: press *9 when prompted
  • When the host is ready for you, you will be called on by your phone number or name (when prompted always start by presenting your full name)

IF YOU ARE INTERESTED IN FOLLOWING ALONG ELSEWHERE:

  • Channel 8 on Comcast
  • Channel 28 or 2130 on Verizon