The 75% Design Submission and First Structural Design Plans have been delivered by the Nitsch Design Team to MassDOT on September 10, 2025. This submission also includes the 75% Preliminary-Right-Of-Way Plans. The 75% Design plans and the Preliminary Right-Of-Way Plans are now posted and available for viewing. This milestone submittal is in accordance with the design schedule to stay on track for the 2026 Fiscal Funding Year. This 75% Submission package will be reviewed by MassDOT, and the 100% Submission is expected to be completed by the end of 2025. The Town, and Nitsch Design Team are continuing active coordination with MassDOT and MBTA to advance the design development with construction bidding anticipated in September 2026.